In accordance with Rule 257.100(e)(4)(iii); No later than April 18, 2017, initiate the inspections by a qualified person as set forth by § 257.83(a).
Weekly Inspections
Weekly inspections are performed by site personnel. These inspections are specific to the ash basin and are in addition to other inspections conducted for various regulatory programs required at the facility. Environmental Resource Management (ERM) Engineers provided general information and inspection guidance to the facility for the development of the inspection program. Copies of the routine inspections are posted on a monthly basis and can be found by clicking on the links below.