In accordance with Rule 257.100(e)(4)(iii);  No later than April 18, 2017, initiate the inspections by a qualified person as set forth by § 257.83(a).

Weekly Inspections

Weekly inspections are performed by site personnel.  These inspections are specific to the ash basin and are in addition to other inspections conducted for various regulatory programs required at the facility.  Environmental Resource Management (ERM) Engineers provided general information and inspection guidance to the facility for the development of the inspection program.  Copies of the routine inspections are posted on a monthly basis and can be found by clicking on the links below.

01 2018 Operator Daily Log

02 2018 Operator Daily Log

03 2018 Operator Daily Log

04 2018 Operator Daily Log

05 2018 Operator Daily Log

06 2018 Operator Daily Log

07 2018 Operator Daily Log

08 2018 Operator Daily Log

10 2018 Operator Daily Log

11 2018 Operator Daily Log

12 2018 Ash Pond Inspections

Start typing and press Enter to search